This article is about DIY Bylaws and when they are required.
Works that are not cosmetic works or minor renovations, commonly referred to as major works, are more serious works to the common property. You will need a by-law for these works to be authorised. This requires a special resolution to be passed at a general meeting of the owners corporation and also the written consent of all owners of your lot. Once passed, the by-law will need to be registered at the NSW Land Registry Services within six months for it to be effective.
Many owners corporations adopt blanket work by-laws which set out the conditions under which works can be carried out. These by-laws will include a template by-law which adopts the conditions set out in the blanket works by-law. Each time an owner wants to carry out major works, they will simply need to insert their lot number, strata plan number, scope of works and attach any plans to the template by-law. This by-law will then be tabled at a general meeting of the owners corporation and once passed, registered at the NSW Land Registry Services.
In addition, there are also services which allow lot owners to create their own by-laws by inputting their lot details, strata plan details, scope of works and plans into a system and a by-law will then be generated using a standard template.
The main issues we have come across with these type of by-laws are as follows:
- Owners corporations will sometimes repeal and replace blanket work by-laws. This means that all the template by-laws that have been registered pursuant to that blanket work by-law will refer to conditions in a by-law that has been repealed and is no longer in effect. Owners corporations should be careful not to repeal blanket work by-laws but instead to insert a note that the blanket works by-law applies only to those specific by-laws and any work by-laws subsequent to that will need to adhere to the new blanket works by-law.
- Lot owners sometimes do not accurately set out the scope of works and attach relevant plans to the by-laws. It is important that the works being carried out are properly set out in the by-law. Where the scope of works refer to plans, these should be annexed to the by-law or minutes or notice of general meeting and the by-law should specifically state this.
Jasmin H.Singh & Allison Benson Kerin Benson Lawyers E: allison@kerinbensonlawyers.com.au P: 02 4032 7990
This is general information and should not be considered to be legal advice. I recommend you obtain legal advice specific to your individual situation.
This post appears in Strata News #600.
Have a question about DIY Bylaws or something to add to the article? Leave a comment below.
Embed Read next:- NSW: Why do you Need to Consider the Registered By-Laws when Preparing a New By-Law
- NSW: OOPS… Someone didn’t Include all Their By-Laws in the Consolidated Set!
- NSW: How Much Is A Strata Report OR 10 Steps to a DIY Strata Report
This article has been republished with permission from the author and first appeared on the Kerin Benson Lawyer website.
Visit our Strata By-Laws and Legislation OR NSW Strata Legislation pages.
Looking for strata information concerning your state? For state-specific strata information, take a look here.
Are you not sure about some of the strata terms used in this article? Take a look at our NSW Strata Glossary to help with your understanding.
After a free PDF of this article? Log into your existing LookUpStrata Account to download the printable file. Not a member? Simple – join for free on our Registration page.